The Evolution of Single & Multifamily Homebuilding...

Proudly Engineered & Manufactured In Lackawanna, New York.

In a world where things are constantly being designed as disposable, the materials used in building high quality homes should not be on the list. Utilizing the most cutting edge building technologies, panelization and modular construction, Forever Homes provides extremely energy efficient homes built from recycled steel and other sustainable materials in a controlled factory environment. No trees are ever harmed in building any home. All materials are waterproof, mold/mildew proof and insect proof. 


On site construction from site work and utilities to final finishing is completed by 100% company owned resources, creating a vertically integrated model with efficiencies never achieved in home building previously. 

Welcome to the evolution of home building...

Our Process

  1. Single and multifamily structures are 3d modeled to create the most efficient uses of space as well as mechanical, electrical, plumbing and structural design
  2. Schematic designs of all systems are sent to the factory floor for fabrication and assembly
  3. Cold form steel is custom rolled with all cuts, notches and holes precision placed on state of the art equipment
  4. Floor assemblies are assembled, with 3/4 structural concrete sub-floor panels installed
  5. Roof trusses, exterior walls and interior walls are assembled and squared using precision forms and jigs using AI guided assembly systems
  6. Mechanical, electrical and plumbing systems are precision placed using cut outs placed in studs/assemblies during the custom fabrication and rolling process
  7. 2 inches of continuous exterior insulation(R13) and weather barrier is installed on the exterior of wall assemblies   
  8. Roof system is installed 
  9. Exterior structural cement sheeting, interior insulation(R19 for total of R31 walls, R49 in roof) and interior drywall is installed never being exposed to weather elements
  10. Interior finishing to include drywall, paint, doors, LVT flooring, cabinets and plumbing/electrical fixtures are installed while exterior brick, metal siding or fiber cement siding are installed simultaneously
  11. Homes are inspected along each step of the process, with final inspection and documentation completed prior to loading for site delivery

While precision factory manufacturing is taking place, onsite work by company tradespeople happens simultaneously:

  1. Site clearing, grubbing and grading
  2. Excavation for foundations
  3. Construction of ICF(insulated concrete form) foundations maximizing strength and efficiency(R30 insulation in foundation around structure)
  4. Utilities are installed to foundation for hook up to modules arriving from factory 
  5. Site is backfilled and graded ready for module installation

Once modules and site are ready, modules are shipped to site and craned into place. Utility hookups and final finishing is completed and homes are ready for occupancy. 

Build time from order to occupancy: as fast as 3 weeks

 

Contact us

E-mail: info@foreverhomes.com

 

Logo

© Copyright 2024. All rights reserved.

We need your consent to load the translations

We use a third-party service to translate the website content that may collect data about your activity. Please review the details in the privacy policy and accept the service to view the translations.